# AWP Full Specification Program

**Date:** 2026-08-19  
**Status:** **P1–P6 COMPLETE / P7 NEXT**  
**Authority:** `AWP-FULL-SPECIFICATION-RATIFICATION.md`, `AWP-INCREMENTAL-DELIVERY-PLAN.md`, `AWP-INCREMENT-REALIZATION-MATRIX.md`, `docs/VISION.md`.

## Objective

Create a complete target-state specification baseline before Increment 0 implementation materially begins, while preserving the ratified I0..I9 implementation boundaries and human-readable documentation standard.

## Program Result

```text
P1 Architecture + ADR baseline              COMPLETE
P2 Domain semantic backbone                 COMPLETE
P3 Cross-domain workflows                   COMPLETE
P4 UI/page + whole-product IA               COMPLETE TARGET BEHAVIOR
P5 Contract/schema baseline                 COMPLETE
P6 Contradiction + traceability review      COMPLETE
P7 I0/I1 high-fi Design Complete            NEXT
```

The complete indexed spec set is at [`../specs/INDEX.md`](../specs/INDEX.md). Completion evidence: [`AWP-FULL-SPECIFICATION-COMPLETION.md`](AWP-FULL-SPECIFICATION-COMPLETION.md). Cross-spec review: [`AWP-FULL-SPECIFICATION-TRACEABILITY-REVIEW.md`](AWP-FULL-SPECIFICATION-TRACEABILITY-REVIEW.md).

## Binding Program Rules

1. Full target state now; later increments are deferred realization, not deferred intent.
2. Increment boundaries remain binding; full I6/I9 specs never authorize early implementation.
3. No throwaway early models; I0/I1 use compatible subsets of final primitives/seams.
4. One technical truth with human HTML presentation.
5. Human auditability is correctness; key relationships/timing/Decisions are discoverable.
6. Implementation pressure cannot silently override target spec; change Decision/spec first.
7. FOSS/Platform mechanics are reused behind AWP-owned semantic seams.
8. No user-facing UI is invented in JSX/CSS; approved high-fi precedes implementation.

## Completed Specification Families

```text
Architecture + reuse        18
ADRs                         8
Domains                     23
Workflows                   13
UI/IA                       14
Schemas/contracts            6
Total indexed specs         82
```

## P6 Result

No unresolved cross-domain identity/authority contradiction was found. Implementation-local choices that remain open are allowed behind existing seams: exact ID encoding, runtime schema library, initial SecretStore/object-store/realtime/auth providers, OTel backend, DBOS wiring and measured Kubernetes resource defaults. If any of these changes a public/product/trust seam, it becomes a Decision/spec amendment.

## P7 — Immediate Execution

Full specification itself is no longer the blocker. User-facing implementation remains blocked by visual Design Complete:

```text
U1 Project + minimal Plan/Task
U2 FactoryRun active
U3 waiting/failure/retry
U4 ChangeSet/Review
U5 Ready to merge
U6 Merged/completed
```

Create polished high-fi in the final product shell, review against specs, correct any conflict, obtain explicit owner visual approval, then start I0 implementation followed by complete I1 dogfood lifecycle.